Our projects

Show filters
Derry Road Logistics Campus

Derry Road Logistics Campus

In addition to being home to Rona’s newest 750,000 square foot distribution center, Derry Road Logistics Campus offers two remaining first class, LEED certified facilities available for lease; 265,803 square feet in Building 1 and 152,828 square feet in Building 3.

Lactalis

Lactalis

In September 2023, Broccolini broke ground on a new distribution centre for Lactalis Canada located in Oshawa, Ontario.

Amazon Belleville YGK-1

Amazon Belleville YGK-1

YGK-1 is an XLFC (Extra Large Fulfillment Centre) project located on a 102-acre site just south of the 401 in Belleville, Ontario. The building stands at approximately 45ft tall, with a 19,820 sq.ft. office and 1,030,027 sq.ft. warehouse.

Amazon Cambridge YHM-2

Amazon Cambridge YHM-2

YHM-2 is a 1M sq.ft. Amazon Distribution Centre, boasting a massive 250,000 sq.ft. mezzanine. Strategically located in Cambridge, ON, adjacent to highway 401, this cutting-edge facility is poised to revolutionize the distribution landscape.

Derry Green Industrial Park

Derry Green Industrial Park

This industrial project is being developed by Broccolini in partnership with Sunlife BentallGreenOak. Broccolini is acting as both the Development Manager and General Contractor for the construction of the largest Industrial Spec Building Project in the Sunlife portfolio.

Valleyfield

Valleyfield

Valleyfield is a state-of-the-art multitenant industrial facility developed by Broccolini and its Limited Partners. This remarkable venture represents Broccolini's first Zero Carbon Ready industrial project in Quebec.

Toromont

Toromont

The Toromont project in Bradford, ON is a 140,000 sq.ft. commercial warehouse and CAT remanufacturing facility. Built to FM Global standards with non-combustible construction, the facility includes dyno engine rooms, a paint Booth, blast booth, and wash booth.

8300 Parkhill Drive

8300 Parkhill Drive

29,000 square feet of Prime Industrial space in the heart of Milton, Ontario. Multi-tenant building perfectly located in the Highpoint Business Park a...

Speedy Transport

Speedy Transport

Speedy Transport spans an impressive 68,000 sqft, featuring a cross dock setup with 80 dock doors and a sleek 6,000 sq.ft. office space. This unique project showcases two distinct structures — a conventional office design and a pre-engineered warehouse structure.

Hanlon Creek

Hanlon Creek

Broccolini is currently constructing two industrial distribution warehouses, strategically located just off the 401 and Highway 6. With one warehouse already set to be occupied by the end of 2023, these state-of-the-art facilities are perfectly positioned to meet various shipping and receiving needs.

McGill University Library Collection Facility

McGill University Library Collection Facility

With a total surface area of approximately 43,000 square feet and a minimum interior height of 7.6 metres, the facility will include a warehouse area with an automated storage/retrieval system for the storage of 2.5 million library volumes.

Patterson Dental Expansion

Patterson Dental Expansion

Patterson Dental's new 30,400 sq.ft. expansion is complete with racking and two impressive pick towers spanning 100 to 120 ft in length. Each tower boasts three levels interconnected by a state-of-the-art conveyor system that seamlessly navigates through the entire structure, connecting it to the existing building.