Our projects

Show filters
Parkhill Drive

Parkhill Drive

Broccolini completed the construction of two state-of-the-art mid bay industrial buildings totalling 252,195 sq.ft. The convenient location, at the intersection of Highways 25 and 401 in Milton, offers great exposure and excellent access to transportation routes.

Premium Outlets - Toronto

Premium Outlets - Toronto

Following the successful completion of the Mirabel Premium Outlets, Broccolini was thrilled to take on another project for Simon Property Group; the construction of Premium Outlets in Halton Hills. Simon Property Group is an international company with more than sixty shopping hubs, retail centres and boutiques to its credit.

980 Valois - Harwood & Valois Phase 2

980 Valois - Harwood & Valois Phase 2

Be part of the excitement! With a booming economy, Vaudreuil-Dorion is the ideal place to develop your business. New industrial building for rent conveniently located in the Loyal-Schmidt industrial park in Vaudreuil-Dorion with easy access to highways 30 and 20.

Costco Wholesale

Costco Wholesale

Broccolini was retained to build Costco Wholesale's 100th store in Canada and 9th store in the GTA. This project featured the integration of a historical facade to a retail location, a different strategy from the wholesaler's existing retail locations.

Sunlife Multi-Tenant Warehouse

Sunlife Multi-Tenant Warehouse

This was Broccolini's second project for the Sunlife Financial Group. Recipient of LEED certification, this building is located in the industrial sector of one of Montreal's largest boroughs with proximity to major thoroughfares and the airport. The project consisted of building a turn-key, base building for multi-tenant warehousing in St-Laurent's industrial sector.

WeWork (240 Richmond)

WeWork (240 Richmond)

Broccolini was awarded the contract to do the interior fit-up of the 3rd floor of this beautiful building. Located in the heart of Toronto’s tech hub, this WeWork office includes six full floors of private office space, a coworking space and meeting rooms.

WeWork (40 King)

WeWork (40 King)

Broccolini was called upon by WeWork to do the interior fit-up of the 41st and 42nd floors of the Scotia Plaza. This WeWork office includes two lounge areas and 8 private rentable office spaces on each floor. The project required the demolition of an existing staircase connecting the two floors and the construction of a new, much larger feature staircase. The project was turned over to WeWork in early December of 2018 to allow their members to move-in.

XTL Transport

XTL Transport

Since 1985, XTL Transport has been growing steadily within a very competitive industry. In 2004, they turned to Broccolini for the construction of a distribution center in Dorval, followed later by the construction of a head office and a garage in Vaudreuil, in 2007. Broccolini had the privilege to once again collaborate with XTL for this project, the construction of a new distribution center in the East-End of Montreal.

Cooper Standard

Cooper Standard

This industrial manufacturing and warehouse facility with associated office space was built for Cooper-Standard Automotive inc. Designed and built by Broccolini, the total building area is approximately 138,133 sq.ft. It includes 130,760 sq.ft. of service area, plant & warehouse facility and 7,373 sq.ft. of finished office space.

Quartier Évolution (Traffic Tech)

Quartier Évolution (Traffic Tech)

In order to meet the demands of the company's growth, Traffic Tech decided to move its headquarters into the Quartier Évolution, a Broccolini commercial development located in Kirkland on Highway 40.

WeWork (33 Bloor)

WeWork (33 Bloor)

Founded in 2010, WeWork offers more than just office space. Its primary mission is to create working communities and to allow its members to develop networking relationships.

Public Works and Government Services Canada

Public Works and Government Services Canada

In order to achieve its goal of increasing the efficiency of public service operations and eliminate unnecessary costs, the Government of Canada opted to modernize its systems. This included, among other initiatives, the addition of a new centre of expertise in Miramichi.