Our projects
Canadian Tire Distribution Centre
In mere months, Broccolini built a massive distribution centre for one of Canada’s largest retailers. Canadian Tire, with whom Broccolini has developed a solid relationship, selected Broccolini for the construction of its 130-million-dollar Eastern Canada distribution centre.
Cardinal Health Canada
Cardinal Health Canada established its new headquarters in Dorval and Broccolini was mandated to carry out this design-build project. Located on Rue De l'Aviation, the construction is a building of nearly 300,000 sq.ft and meets the operational and distribution needs of Cardinal Health Canada.
Cathedral Hill
Cathedral Hill is a green condominium construction project, located near the Christ Church Cathedral and overlooking the prestigious historical district in Ottawa.
Cavendish Mall
Broccolini was selected for two (2) renovation and expansion projects. The first project consisted in the restauration of the 1960s building in order to transform it into a modern multi-tenant shopping centre. The second project involved the construction of a sixth (6) floor to be built atop the existing building tower.
CCL Label
Already operating on the South Shore of Montreal on a smaller scale, CCL Label turned to Broccolini for the design and construction of their new facility to be located in Saint-Bruno-de-Montarville; a building specifically designed for pharmaceutical labelling.
Centre Laval
Early in the second quarter of 2005, Alexis Nihon announced a significant investment in an expansion project of the Centre Laval shopping centre located in Chomedey.
Ciena
Business telecommunications and networking company, Ciena, needed to expand their facilities in order to respond to their growth. The project consisted of 3 buildings, including 2 new buildings, for a total area of 425,000 square feet located in the new Ottawa Campus. The project represents an investment of $150 million.
Clarke Transport
A construction of a 50,000 sq.ft. built for Clarke Transport. This building comprised a loading dock with administrative facilities. The transshipment facility has a warehouse area of nearly 50,000 sq.ft., extending over 750 ft.
Conestoga Cold Storage
In December 2020, Conestoga Cold Storage entrusted Broccolini with the management of its new expansion project (Phase 3) of its existing warehouse in Vaudreuil.
Cooper Standard
This industrial manufacturing and warehouse facility with associated office space was built for Cooper-Standard Automotive inc. Designed and built by Broccolini, the total building area is approximately 138,133 sq.ft. It includes 130,760 sq.ft. of service area, plant & warehouse facility and 7,373 sq.ft. of finished office space.
Costco Distribution Centre
Broccolini successfully designed and built Costco's 300,000 sq.ft. distribution centre. Located in St-Bruno, the building was designed with a view to...
Costco Wholesale
Broccolini was retained to build Costco Wholesale's 100th store in Canada and 9th store in the GTA. This project featured the integration of a historical facade to a retail location, a different strategy from the wholesaler's existing retail locations.